QTB · QuickTie Wood Frame Blue Cable | QuickTie™

QuickTie Wood Frame Blue Cable

3/16" 7×19 galvanized aircraft wire rope with threaded studs swaged to both ends: one continuous tie from the uppermost top plate to the foundation.

QTB20.3 is the 20'-3" length of this cable.

Drag to rotate
Allowable loads

One cable, one number

There's no fastener schedule: the load comes from the wire rope and its embedment. The other wood-frame cables are alongside to compare.

Cable Wire rope Min. embedment Edge distance Concrete f'cBreaking strength Allowable load
Blue · QTBthis cable 3/16" 4" 2-1/4" 2,500 psi4,200 lb 1,910 lb
Green · QTG 1/4" 4" 2-1/4" 2,500 psi7,000 lb 3,180 lb
Orange · QTO 5/16" 6-5/8" 3" 2,500 psi9,800 lb 4,455 lb
Red · QTR 3/8" 8-1/8" 3-1/2" 2,500 psi14,400 lb 6,545 lb

Loads in pounds at the concrete strength shown. QE-1 / QE-2 epoxy anchors the cable to the foundation.

Installation

8 steps, slab to top plate

  1. Installation step 1

    1 Drill a hole in the concrete through the sill plate. Use QuickTie™ recommendations for depth and diameter required depending on wire/swage size.

  2. Installation step 2

    2 Clean the hole using compressed air, then with a metal brush, and again with compressed air. Follow OSHA standards and practices.Uses 1BSH brush

  3. Installation step 3

    3 Drill a hole through the top plate aligned with the hole in the sill plate.

  4. Installation step 4

    4 Feed the QuickTie™ cable through the top plate.

  5. Installation step 5

    5 Inject the epoxy into the concrete hole, filling about half of the hole.Uses QE-1 epoxy

  6. Installation step 6

    6 Making sure it is the correct end, insert the QuickTie cable into the hole with epoxy, which should then slightly overspill from the hole. Let the epoxy cure for the recommended time.

  7. Installation step 7

    7 Once the epoxy has set, tension the cable to the proper elongation.

  8. Installation step 8

    8 The label on the wire rope indicates how many inches of the threaded stud should be exposed above the nut after tensioning.

Full wood-frame installation guide

Application details

Typical Spacing
Typical Spacing
Column Installation
Column Installation
Column Installation
Column Installation
Portal Frame Installation
Portal Frame Installation
Shearwall Installation Options
Shearwall Installation Options
QuickTie Cable to Threaded Rod Installation
QuickTie Cable to Threaded Rod Installation
Catalog pages

Find it in print

Code reports

Evaluated and approved

You might also need

Finish the install

More QuickTie Cable series

See all
QuickTie Cable

QuickTie Masonry Blue Cable

QuickTie™ cables are used to resist uplift loads from the roof system, shear at the bottom plate and overturning forces at the ends of shear walls. When QuickTie™ cables are used, it is possible to omit all straps and construction hardware between the double top plates on the uppermost floor to the sole or sill plate on the lowest floor. Hurricane clips attaching the double top plate to the trusses must remain, however. A single QuickTie™ installed between the double top plate of the uppermost floor and the foundation serves adequately as a hold down for any shear wall. It replaces one holddown on the lowest floor and straps between floors at the second floor and third floor.

Series QTBM · 672 SKUs Specs & loads
QuickTie Cable

QuickTie Masonry Green Cable

QuickTie™ cables are used to resist uplift loads from the roof system, shear at the bottom plate and overturning forces at the ends of shear walls. When QuickTie™ cables are used, it is possible to omit all straps and construction hardware between the double top plates on the uppermost floor to the sole or sill plate on the lowest floor. Hurricane clips attaching the double top plate to the trusses must remain, however. A single QuickTie™ installed between the double top plate of the uppermost floor and the foundation serves adequately as a hold down for any shear wall. It replaces one holddown on the lowest floor and straps between floors at the second floor and third floor.

Series QTGM · 671 SKUs Specs & loads
QuickTie Cable

QuickTie Masonry Orange Cable

QuickTie™ cables are used to resist uplift loads from the roof system, shear at the bottom plate and overturning forces at the ends of shear walls. When QuickTie™ cables are used, it is possible to omit all straps and construction hardware between the double top plates on the uppermost floor to the sole or sill plate on the lowest floor. Hurricane clips attaching the double top plate to the trusses must remain, however. A single QuickTie™ installed between the double top plate of the uppermost floor and the foundation serves adequately as a hold down for any shear wall. It replaces one holddown on the lowest floor and straps between floors at the second floor and third floor.

Series QTOM · 672 SKUs Specs & loads
QuickTie Cable

QuickTie Masonry Red Cable

QuickTie™ cables are used to resist uplift loads from the roof system, shear at the bottom plate and overturning forces at the ends of shear walls. When QuickTie™ cables are used, it is possible to omit all straps and construction hardware between the double top plates on the uppermost floor to the sole or sill plate on the lowest floor. Hurricane clips attaching the double top plate to the trusses must remain, however. A single QuickTie™ installed between the double top plate of the uppermost floor and the foundation serves adequately as a hold down for any shear wall. It replaces one holddown on the lowest floor and straps between floors at the second floor and third floor.

Series QTRM · 672 SKUs Specs & loads

Ask QuickTie

Tell me what you're building and I'll find the QuickTie connector for it. Sizes, loads, wood species, coating or a competitor part number all help.

An unhandled error has occurred. Reload 🗙